Product Backlog

The product backlog from which tasks are derived for each sprint.

March 30, 2025 · 4 min · Razvan

Requirements Engineering

I define all 5 requirement types: Business, Functional (user and system), Non-Functional, Implementation.

March 27, 2025 · 11 min · Razvan

User Interfaces

This document contains images with the UIs. They allow inspection of the UI without installing the app.

March 26, 2025 · 1 min · Razvan

Sprint 5

The fifth sprint focused on writing the final report, analysis and wrapping up the project.

April 21, 2025 · 0 min · Razvan

Sprint 4

The fourth sprint focused on performance optimization, visualization features, completing the Scala.js frontend, and documentation.

April 14, 2025 · 0 min · Razvan

Sprint 3

The third sprint focused on implementing Git repository cloning, code extraction, and acceptance tests.

April 7, 2025 · 0 min · Razvan

Sprint 2

The second sprint focused on implementing Git repository cloning, code extraction, and initial indexing processes.

March 31, 2025 · 0 min · Razvan

Sprint 1

The first sprint focused on setting up the project infrastructure, including Github Workflows with CI/CD pipelines.

March 24, 2025 · 0 min · Razvan